On-Premises to Cloud Migration: Complete TCO Analysis Framework 2025

Moving from on-premises infrastructure to the cloud is one of the most significant IT decisions an organisation can make. A proper TCO analysis is what separates a confident migration from an expensive mistake.

The On-Premises Cost Iceberg

Most people focus only on visible costs. The real structure looks like an iceberg:

  • Visible: Server hardware, network equipment, software licences
  • Hidden (2–3x the visible costs): Data centre space, power and cooling, staff salaries, maintenance contracts, disaster recovery, insurance, facilities management

A physical server that costs $5,000 to purchase often carries a 3-year total cost of $15,000–$25,000.

Calculating Your On-Premises TCO

Step 1: Hardware Costs

Use straight-line depreciation over 5 years for owned hardware, or annual lease cost for leased equipment.

Step 2: Data Centre Costs

Typical Singapore colocation costs: SGD $800–$1,500 per rack unit per month. Include power, cooling, and remote hands.

Step 3: Staff Costs

Rule of thumb: 1 full-time infrastructure engineer per 100 servers. Fully loaded cost in Singapore: SGD $80,000–$150,000/year.

Step 4: Disaster Recovery

Most organisations maintain a secondary DR site at 30–50% of primary site cost. Cloud DR is dramatically cheaper.

Real Example: 80-Server Singapore Environment

ItemOn-Premises AnnualCloud Annual
Compute/HardwareSGD $200,000SGD $360,000
Data Centre / HostingSGD $480,000SGD $0
StaffSGD $360,000SGD $280,000
DR SiteSGD $200,000SGD $60,000
Software & LicencesSGD $120,000SGD $48,000
Total Annual TCOSGD $1,360,000SGD $748,000

Annual saving: SGD $612,000. Break-even: under 6 months.

Upload your on-premises inventory to TCOIQ and get an AI-generated TCO comparison across all four clouds in minutes.

Ready to Compare Your Cloud Costs?

Use our free VM comparison tool or get an AI-powered TCO analysis for your full environment.

Compare Prices Free → AI TCO Analysis — $5/mo